Home / What we automate for contractors

Services

What we automate for contractors

We automate the repeated paperwork around a construction job: lien waiver (a signed paper that gives up the right to claim against a property for unpaid work) packets, change orders, pay applications, bid follow-up, daily reports and subcontractor insurance and agreements. Each workflow below says what starts it, what data it touches and what stays with a person.

How to read this page

For each workflow we name the trigger (what starts it), the data it reads and writes, and what we would leave to a person. This is the design we would bring to the review call, drawn from how the paperwork works. Each one links to the guide that explains the paperwork itself.

Lien waiver packets

Trigger: a pay application (the monthly request for payment) is approved for submission. Reads: the pay application, your vendor list with amounts for the period, and the job's state. Does: builds the list of every party owed money in the period, picks the waiver type and your attorney-approved wording for the state, emails each party a request, tracks replies, and chases the late ones. Checks: that no unconditional waiver is accepted before a cleared payment is matched to it. Person decides: the wording, and any exception to the standard process. Guides: lien waivers, by state, conditional or unconditional.

Change orders

Trigger: a field request, an RFI response or an owner email that changes the scope. Reads: your cost codes and rates, the contract sum, the schedule of values (the contract price split into billable lines). Does: drafts the change order (a signed change to the contract's scope, price or time) from the request, prices it from your own rates, routes it for the owner's signature, and when it is approved updates the log and the contract sum and the billing schedule. Checks: work started on an unsigned change. Person decides: the price and whether to proceed at risk. Guides: change orders, the log.

Pay applications and progress billing

Trigger: the billing date. Reads: job cost, percent complete from the field or the project manager, stored material records, retainage (the share of each payment an owner holds back until the work is done) terms. Does: builds the billing worksheet, checks that the lines add up to the contract sum, applies retainage, and flags a line billed over its scheduled value. Person decides: the percent complete, which is a judgment. Guides: schedule of values, AIA-style billing.

Bids and proposals

Trigger: an estimate is marked final. Reads: the estimate, your standard inclusions, exclusions and allowances. Does: assembles the proposal document, tracks which proposals are open and how long, and reminds the estimator to follow up. Person decides: price, scope language and who to follow up with. Guides: bid and proposal, estimate.

Daily reports and owner updates

Trigger: field notes arrive by text, email or form. Does: sorts them into a structured report (crew, work, deliveries, delays), files it, and sends the owner or project manager a short end-of-day summary. A summary of delays can flag the ones that may justify a change order. Guide: daily construction report.

Subcontractor paperwork

Trigger: an expiry date approaching. Reads: the sub's insurance certificate dates and agreement status. Does: asks for the new certificate before the old one lapses and holds the sub's new payment request until it arrives, if you choose that rule. Guide: subcontractor agreement.

Moving data between systems

The least visible and often the largest saving: the same job number, customer name, amount and date are typed into an estimating tool, a project system, an accounting system and a spreadsheet. A sync workflow reads one system and writes the others, with a log of every change. Whether that is possible depends on what each system offers. Our software guides read each vendor's documentation: JobTread, Procore, Buildertrend, Contractor Foreman.

What we will not build

How an engagement runs

The first step is the free 45 minute review. We then send a written scope that lists each workflow separately with what it connects to, what it will not do, and what it costs, so you can accept one. We build in pieces and you test each on real paperwork before the next starts.

Questions people ask

Which workflow should a contractor automate first?

The one that runs on a fixed rhythm and eats the most office hours. For most general contractors that is the monthly pay application and its lien waiver packet, because it happens every month on every job and the inputs already exist in your job-cost system.

Does an automation sign lien waivers or change orders for us?

No. The workflows below prepare, route, remind and check. A person with authority signs, and the automation records that it happened. Where a statute requires specific wording, a person with your attorney chooses the wording once and the automation only fills in the blanks.

What happens when our software changes its screens or its API?

A custom workflow depends on what the connected system exposes, and that can change. We read each vendor's own documentation before building, and the written scope states what the workflow depends on, so you know what to watch when a vendor announces a change.

Can you build this on a spreadsheet-only office?

Yes, if the spreadsheets are consistent. A workflow that reads a well-kept spreadsheet is easier to build than one that depends on a system with no public interface. The free templates on this site show the layout we would start from.

Talk through what to automate first

A free 45 minute call. We look at how your office runs today, from lien waivers to pay applications, and tell you what is worth building and what is not.

Book a free automation review