Construction bid and proposal template

A construction bid or proposal states what you will build, what is included and excluded, what it costs, how long it takes and how you get paid, in a form the client can accept by signing. Our free Word template has ten sections for exactly that, with a prompt under each heading.

The ten parts and what each protects you from

  1. Scope of work. Trade by trade, with the drawings, specifications and addenda it is based on, with dates. It protects you from "I thought that was included."
  2. Inclusions. Items people forget to price: permits, dumpsters, mobilization, cleanup, testing. Naming them shows the price is complete.
  3. Exclusions. What you are not providing, in specifics. See the FAQ below.
  4. Allowances. Amounts for items not yet selected (fixtures, finishes), with what happens if the real cost is higher or lower.
  5. Price. The amount and its type: lump sum, unit price or cost plus. For a lump sum, attach a breakdown you can reuse as the schedule of values.
  6. Schedule. A start window and duration, or milestones, plus what can move them: weather, owner decisions, material lead times.
  7. Payment terms. Deposit if any, how progress billing works, the retainage (the share of each payment an owner holds back until the work is done) rate, due dates and late terms.
  8. Changes. A sentence that work outside this scope is priced and approved in a signed change order before it starts.
  9. Insurance. The coverages you carry and that certificates are available on request.
  10. Acceptance. Signature and date for both parties, and a validity date after which the price lapses.

Writing exclusions and allowances that hold up

The two sections that cause the most arguments are the ones most often written vaguely. An exclusion that says "other work not shown" settles nothing. One that says "Painting, floor finishes, landscaping, utility connection fees and removal of hazardous materials are excluded" gives the client a list to question before signing, not after. For allowances, state the amount, what it covers (supply only or supply and install), and the rule for the difference: "any cost above the allowance is added by change order (a signed change to the contract's scope, price or time), any saving is credited."

Public bids and invitations

When a public owner invites bids, the invitation sets the form, the deadline and often the required attachments, including any bid security. Follow it exactly: a proposal that departs from the invitation's format can be rejected for that alone. Our template suits negotiated work and private invitations; for a public bid, use the owner's bid form and treat our sections as a checklist for your cover letter and qualifications.

A bid bond, where required, is arranged with your surety agent before bid day, and the agent will want to see your financials. Start early; it is not something to arrange the night before.

After the yes

Once the proposal is accepted it usually becomes the base of the contract. Three things should flow from it without retyping: the price into a schedule of values (the contract price split into billable lines), the exclusions into the change order process (each exclusion is a likely future change), and the schedule into your project plan. Our construction schedule template and change order log start from those. Estimating software can feed some of this; see estimating software compared.

Following up

Most proposals are lost to silence rather than to a better price. A short follow-up two or three days after sending, one at a week, and a last note before the validity date is a routine you can put on a calendar, or on a workflow that surfaces open proposals each morning. Keep the notes factual: restate the validity date, offer to walk through the scope and ask whether a question has come up.

Free: bid and proposal template

Ten sections with a prompt under each, plus the full paperwork pack by email if you want the estimate, schedule and invoice templates.

Download the proposal template (Word) (no email needed).

The pack is every spreadsheet and printable form on this site in one zip. We send one email to confirm your address, then a link to the pack. Unsubscribe any time. Or download the pack now.

Informational only. The template is a generic starting point and is not legal advice. Ask an attorney in your state to review the terms before first use.

Questions people ask

What is the difference between a bid, a proposal and an estimate?

An estimate is your internal calculation of cost. A bid is a price you submit in competition, usually on the owner's or general contractor's terms and by a deadline. A proposal is a price plus the scope, terms and conditions you offer to a client, often on a negotiated job. People use the words loosely, so check what the invitation asks for.

How long should a bid or proposal stay valid?

State a validity date on the document, because material prices and your availability move. How long is your decision; shorter periods protect you when prices are volatile. Many bid invitations set their own period, so follow theirs.

What is a bid bond?

A bid bond is a surety guarantee that a bidder who is awarded the work will sign the contract and provide any required performance and payment bonds, and that the owner can recover a stated amount if it does not. Whether you need one is set by the bid invitation. Your surety agent writes it.

Should I list exclusions in a proposal?

Yes, plainly. Exclusions are the most protective part of a proposal because most disputes are about work the client assumed was included. A short list of specifics, such as painting, landscaping, utility connection fees or hazardous material, beats a general disclaimer.

Where do I find construction jobs to bid on?

Public owners post invitations to bid on their own procurement sites, and private owners and general contractors send invitations directly or through bid-distribution services. For public work, search the procurement portal of the state, county or municipality you work in.

Talk through what to automate first

A free 45 minute call. We look at how your office runs today, from lien waivers to pay applications, and tell you what is worth building and what is not.

Book a free automation review