Pick the form in this order: first your state (some states require the statute's own wording), then conditional or unconditional (has the payment cleared?), then progress or final (is this the last payment?). We do not host a one-size lien waiver (a signed paper that gives up the right to claim against a property for unpaid work) form, because the right wording is set by statute in several states.

Step 1: find out whether your state sets the wording

Some states write the lien waiver into the statute and say a waiver that departs from it does not count. Others only set rules about timing and leave the wording to the parties. That is why a "free lien waiver form" from a random site can be the wrong one. We read the statutes for six states and list what each says on lien waivers by state. For California and Arizona there are dedicated pages with the form sections walked through: California and Arizona.

Step 2: choose conditional or unconditional

Ask one question: has the money cleared? If you are signing in exchange for a check you do not hold, or you hold a check that has not cleared, you use the conditional form. If the payment has cleared and you are confirming it, you can use the unconditional form. The unconditional forms we read in Arizona and California carry a notice that the document is enforceable against you if you sign it, even if you have not been paid. The detail is on conditional vs unconditional lien waivers.

Step 3: choose progress or final

A progress form covers work through a stated date and leaves out retainage (the share of each payment an owner holds back until the work is done) and later work. A final form covers the whole job. Use the final form only for the final payment, and only once you are sure there is nothing left to bill, including retainage, extras and pending change orders.

Step 4: fill in the blanks the same way every time

  1. Project and job number. Use the name on the contract and your own job number, so the waiver can be matched to the pay application (the monthly request for payment).
  2. Who you contracted with. The statutory forms ask for the person with whom the signer contracted. A subcontractor names the general contractor; a general contractor names the owner.
  3. Owner and property. Use the owner's legal name and the address or legal description from the contract.
  4. Through date. The last day of the work period you are waiving. It should match the pay application period.
  5. Amount, and for conditional forms, the check. The conditional forms we read name the maker of the check, the amount and the payee.
  6. Exceptions. Some forms list what is not waived: retainage, unpaid extras, earlier unpaid progress payments. Read this block before signing.
  7. Signature, title and date. By someone authorised to sign for the company.

Why we do not post a form for download

Posting a lien waiver form invites people to use it in a state where it is not enforceable. The statutes are public law and your state's site hosts the current text, so we point to them rather than keep a copy that can go stale. What we do offer is a tracker that records which form was used for each waiver, with a column for the citation, and a state sheet with the statutes we read.

Free: lien waiver tracker with a state sheet

Record the type, through date, payment and cleared date for every waiver, and the statute behind the form you used.

Download the lien waiver tracker (xlsx) (no email needed).

The pack is every spreadsheet and printable form on this site in one zip. We send one email to confirm your address, then a link to the pack. Unsubscribe any time. Or download the pack now.

Informational only. This page is not legal advice and is not a lien waiver form. Always take the form wording from your state's current statute, and ask a construction attorney when you are unsure.

Questions people ask

Can I just download a generic lien waiver form and use it?

In Arizona, California and Nevada the sources we read say a waiver is effective or enforceable only if it is in, or substantially in, the statutory form. A generic form is a risk there. In Florida a waiver that is not substantially similar is enforced by its own terms, but Florida also says no one may demand a form other than the statutory ones. The state decides.

What goes in the blanks of a lien waiver?

The statutory forms we read ask for the project, the job number, who the signer contracted with, the owner, the property location, the amount, and a through date. Unconditional forms add a printed notice, and conditional forms name the check by maker, amount and payee.

Where do I get the official form text?

From your state's own statute site. The Sources list at the bottom of this page links the statutes we read. Copying the text from the statute avoids the risk of an outdated copy on a third-party site.

Do I need a separate lien waiver for each subcontractor?

Yes. Each claimant signs for its own work and amount. A general contractor's waiver does not release a subcontractor's rights, and the reverse is also true.

Sources and date checked

Every statute, vendor and price statement on this page was read on the page linked below on the date shown. Where a vendor page did not say something, this page says so instead of guessing. The links go to the original pages, not to summaries.

Talk through what to automate first

A free 45 minute call. We look at how your office runs today, from lien waivers to pay applications, and tell you what is worth building and what is not.

Book a free automation review