Home / Change order form: fields, email wording and a free template
Change order form
Change order form: fields, email wording and a free template
A change order (a signed change to the contract's scope, price or time) form needs eight things: project and parties, a number and date, a specific description of the change, the cost to add or deduct, the days to add or remove, the contract sum before and after, signatures from people with authority, and the reference that triggered it. Our free Word template has all eight.
Field by field
| Project and parties | Project name and address, owner or customer, contractor, and the contract the change belongs to, with its date. This makes the document stand alone if it is found in a file years later. |
|---|---|
| Number and date | Sequential per project. Use the date the change was requested for the log and the date signed for approval. |
| Description | What is added, removed or changed, in words a stranger could act on. Name the drawing sheet, specification section or RFI. |
| Cost | Add or deduct, broken into labor, materials, equipment, subcontractors and overhead and profit. A breakdown answers the owner's first question before it is asked. |
| Time | Days added or removed, and the new completion date if it changes. Write "no change to the completion date" if that is the case, so nobody can claim you forgot. |
| Contract sum | Before this change, this change, after this change. The after figure is the number the next pay application starts from. |
| Agreement text | A sentence saying both parties agree to the stated price and time, that work on the change starts on signature, and that all other contract terms stay as they are. |
| Signatures | The person with authority to change the contract on each side, with title and date. Check your contract for who that is. |
What the AIA form is, and why ours is different
The American Institute of Architects publishes standard contract and administration forms, including change order forms, that many commercial contracts name. AIA sells its forms, so we do not reproduce or imitate their layout. Our template is generic: it covers the fields above in our own wording and layout. If your contract says the change must be on a particular AIA form, use that form.
Sample email asking for approval
Edit this to fit. The point is that the price, the days and the starting condition are all in the email, and that it is sent at the time you learn of the change.
Subject: Change order [number], [project]: [short description]
[Name], following [the RFI answer, the drawing revision, your email of date], we priced the change below. Scope: [one sentence]. Cost: add $[amount], with the breakdown attached. Time: [days] added, new completion date [date], or no change. Please sign and return the attached change order by [date]. We start this work on receipt of the signed change order, and the schedule above assumes that date. [Your name]
Tips that save disputes
- Send the change order to the person who signs, not only the person you talk to on site.
- Quote deductions as carefully as additions. A change order that only adds looks one-sided.
- Keep an unsigned change as "pending" in the log, with the date you sent it, rather than letting it disappear into email.
- When a subcontractor does the work, get its change order in writing before you send yours up the chain.
- Do not start billing a change before it is signed unless your contract says you may.
Free: change order template and the full pack
A generic Word change order with cost, time and agreement blocks. The pack adds the log, the schedule of values worksheet and the rest.
Download the change order template (Word) (no email needed).
Informational only. The template is a generic starting point provided as is and is not legal advice. Have a construction attorney in your state review it before first use.
Questions people ask
Can I use this template instead of the AIA change order form?
Use whatever your contract names. If your contract requires an AIA form, use that form. Our template suits work where the contract only says changes must be in writing and signed, such as many residential and small commercial jobs. Ask your attorney if you are unsure which applies.
What should a change order email say?
State what changed, the price and days impact, what you need and by when, and that work on the change starts on signature. Sample wording is below. Keep the email, because it is evidence of when the owner was notified.
Is a signed email enough to approve a change order?
That is a question about your contract and your state's law on electronic signatures. Many contracts say written and signed. Do not assume an email reply counts until the contract or your attorney says so.
How many change orders can one project have?
There is no set number. Number them in order, never reuse a number, and keep rejected and withdrawn ones in the log so the sequence has no gaps.
Sources and date checked
Every statute, vendor and price statement on this page was read on the page linked below on the date shown. Where a vendor page did not say something, this page says so instead of guessing. The links go to the original pages, not to summaries.